  Electricity Services  
 


Generation, Transmission and Distribution of electrical power to cover the needs of the consumers at the various residential, industrial and commercial sectors throughout the Emirate of Sharjah as well as the requirements of the public utilities such as government buildings, hospitals, mosques and lighting of public parks, streets etc. To provide such services, SEWA has established generation power stations and transmission and distributions covering all parts of the Emirate.

Requirements & Procedures

The process of offering Electricity  services is subject to several transactions such as applications, inspection, specification preparation, cost evaluation and issuing A/c Nos. in accordance with the location and finally the connection of the required service. The following documents are required:-

Electricity Connection:

The process of offering Electricity ,Water and Natural Gas services is subject to several transactions such as applications, inspection, specification preparation, cost evaluation and issuing A/c Nos. in accordance with the location and finally the connection of the required service.

The following documents are required:-

Permanent Connection
The Provision Connection
Documents required for meter relocation
Documents required for changing the meter or increasing the load
Documents required for demolition and disconnection

  Permanent Connection

- Application for electricity supply.
- The drawing approved by SEWA.
- The trade license of electrical contractor approved by SEWA.
- The license of the electrical contractor issued by the Municipality.
- Plot Map.
- Building permission.
- Passport copy.
- Initial inspection application.

  Remarks
The electrical connection is to be made upon forwarding the building completion certificate from the Municipality.

  The Provision Connection

- Application for electricity supply.
- The trade license copy of the electrical contractor approved by SEWA.
- Plot map.
- Building permission.

  Documents required for meter relocation

- No Objection Letter from the concerned branch office.
- Plot Map.
- A/c No. + Meter No.

  Documents required for changing the meter or increasing the load

- Application for electricity supply (the old load + the new load)
- The trade license of the electrical contractor approved by SEWA.
- Plot Map.
- Previous invoice.
- Building permission.
- No Objection Letter from the owner.

  Documents required for demolition and disconnection .

- Letter of closing the A/c from the concerned branch office.
- Plot Map.
- Letter of demolition from the Municipality.

 
 

 